ENGINEERED STEEL · NATIONWIDE DELIVERY
T-15 / AIRCRAFT HANGARS

Hangars with the door width aircraft actually need

T-hangars and clear-span box hangars with hydraulic or bi-fold door framing, tall clear openings, and airport-authority coordination.

Typical configuration

80×120
80′ WIDTH20′ EAVE

PRELIMINARY ESTIMATE. SUBJECT TO SITE VERIFICATION, ENGINEERING REVIEW, LOCAL BUILDING-CODE REQUIREMENTS, FINAL MATERIAL PRICING, AND FOUNDATION REVIEW.

Preliminary pricing

3 SCOPES
Building kit only$397,200 – $465,500
MATERIALS DELIVERED TO YOUR SITE · ≈ $44.49/SQ FT
Kit + erection$506,400 – $593,600
DELIVERED AND ERECTED BY AN INSURED CREW · ≈ $56.72/SQ FT
Turnkey$619,700 – $726,300
SLAB, ERECTION, AND INTERIOR BUILDOUT · ≈ $69.41/SQ FT

What's included

STANDARD
Bi-fold / hydraulic door framing
Clear openings to 100'
Wide clear span
Airport review support

Common uses

APPLICATIONS
  • Private aircraft
  • T-hangar
  • Maintenance
  • Corporate

Where we build

ALL 50 STATES

Delivery and erection in every state, engineered to local loads. Featured markets — or browse all state and city pages:

Questions we get

FAQ
How much does a steel building cost?

Most building kits land between $17 and $30 per square foot before foundation and erection. A delivered-and-erected 40×60 typically runs $88,000–$118,000 in most US markets; coastal and heavy-snow regions trend higher, and turnkey with slab and buildout runs higher still. Your final number depends on eave height, snow and wind loads, door openings, and finish level.

Do you handle engineering and permits?

We do not perform engineering or pull permits directly. We act as your co-pilot through sourcing and purchasing the metal building: we help you find a licensed engineer in your state, work with your engineer, answer permit questions, and provide free permit checklist and cover-letter templates you can download. The permit itself is pulled by the owner or GC of record.

How long does it take to get a building?

Preliminary concept and estimate: 1–3 business days. Sealed drawings after order: 3–5 weeks. Fabrication and delivery: 6–12 weeks depending on mill schedules. Erection of a typical 40×60 takes 2–3 weeks once the slab has cured.

Can I buy just the kit and erect it myself?

Absolutely. Kits ship bolt-together with a marked erection manual and piece list. Many contractors and experienced owners self-erect. We can also supply an insured crew for all or part of the work.